Service

Bathroom Fit-Outs

Complete bathroom renovations — coordinated from rip-out to final silicone by one team, so you're not chasing multiple trades.

Bathroom Fit-Outs

What's included

  • Full strip-out and waste removal
  • First-fix plumbing and electrics
  • Wall and floor tiling
  • Plastering and skimming
  • Suite installation — bath, shower, WC, basin
  • Extractor fan, lighting and second-fix
  • Sealing, snagging and clean handover

Problems we solve

  • Cold, dated bathrooms that don't suit the rest of your home.
  • Leaks, poor drainage or ventilation issues.
  • Wanting a walk-in shower or standalone bath but unsure of layout.
  • Landlords needing a quick, cost-effective refresh between tenancies.

Our process

  1. 01

    Design & spec

    We help finalise layout, tiles and suite — or work from your chosen scheme.

  2. 02

    Rip-out

    Careful removal of existing suite, tiles and any redundant pipework.

  3. 03

    First-fix

    Plumbing, electrics and any structural adjustments before boarding.

  4. 04

    Tiling & fit

    Wall and floor tiling, suite installation and second-fix.

  5. 05

    Handover

    Sealed, tested, cleaned and walked through with you.

Frequently asked

How long does a bathroom take?+

Typically 2–3 weeks depending on tile complexity and any structural changes.

Do you supply the suite and tiles?+

Either — we're happy to specify and supply, or install a suite you've chosen yourself.

Can you move plumbing?+

Yes. Repositioning WC, basin or shower is common — we handle the plumbing and building work in-house.